Wheaton Sanitary District - Pleasant Hill Road Lift Station

The project consists of disconnecting the service and removing and replacing the existing pump control panel located in the existing electrical equipment enclosure. The Work also includes relocating the existing pump control panel near the west well and/or bypass pumping acround the lift station. The proposed pump control panel shall be furnished by the one of the System Integrators as selected by the Owner as Alternate No. 2 or No. 3. The work shall include an Alternate No. 1 to possibly replace the existing underground service entrance conductors to the existing electrical equipment enclosure.

Status

Accepting Bids

Bid Date1/3/19 1:30 pm

Company & Contacts

Rempe-Sharpe & Associates Inc.

Jim Bibby (jbibby@rsaengr.com)   630-232-0827 x. 212

BID DUE DATE:
Thursday, January 3, 2019 – 1S:30PM
Wheaton Sanitary District – Administrative Office
1S649 Shaffner Rd., Wheaton, IL 60189

PRINTED SET: $35.00 NON-REFUNDABLE DEPOSIT
PAYABLE TO: REMPE-SHARPE & ASSOCIATES INC.

SEND CHECKS TO:
BHFX DIGITAL IMAGING
ATTN: PLAN ROOM
80 W. SEEGERS RD.
ARLINGTON HEIGHTS, IL 60005

DOWNLOAD: $25.00
PAYABLE TO: BHFX VIA CREDIT CARD OR HOUSE ACCOUNT

Bid Documents are available to Plan Rooms through BHFX
Plan Rooms must contact BHFX in order to request files