SD U-46 Lockdown Hardware Phase 5 & Fire Alarm Replacement & Upgrades

The work includes, but is not limited to, upgrading existing door hardware and installing new doors and hardware at Elgin High School and Streamwood High School. Additionally, installation of a new fire alarm system at Streamwood High School and minor updates to the existing fire alarm system at Elgin High School. Refer to the Drawings and Project Manual for the full extent of the Work.

Status

Accepting Bids

Prebid Date1/10/19 2:30 pm

Bid Date1/22/19 1:30 pm

Company & Contacts

DLA Architects Ltd

William Templin (w.templin@dla-ltd.com)   847-742-4063

Location

Elgin HS - 1200 Maroon Dr., Elgin, IL 60120; Streamwood HS - 701 W. Schaumburg Rd., Streamwood, IL 60107

Bids are invited from qualified Contractors for the complete construction of this Project under one General Contract, including all trades as specified in the Project Manual

BID DUE DATE:
Tuesday, January 22, 2019 – 1:30PM
SD U-46 – Plant Operations
Conference Room Entrance (2nd Blue Awning east side of building)
1460 Sheldon Dr., Elgin, IL 60120

PRE-BID MEETING: Non-Mandatory
Thursday, January 10, 2019 – 2:30PM
Streamwood HS
701 W. Schaumburg Rd., Streamwood, IL 60107

PRINTED SET: $100.00 NON-REFUNDABLE DEPOSIT
CHECK PAYABLE TO: SD U-46.

CHECK MUST BE RECEIVED BY BHFX BEFORE YOUR DOCUMENTS ARE SHIPPED
SEND CHECKS TO:
BHFX DIGITAL IMAGING
80 W. SEEGERS RD.
ARLINGTON HEIGHTS, IL 60005

1 CD may be purchased from BHFX for $25.00, but the bidder must first obtain at least 1 bid set with a deposit. The CD can be billed to the bidder’s BHFX House Account, paid for by credit card or paid by a separate check for $25.00 payable to BHFX. If you would like a CD, please indicate that in the Comments section during the ordering process.

Bid Documents are available to Plan Rooms through BHFX
Please place your order directly on the BHFX Plan Room