SD U-46 Pressbox, New Lights & Track Repair at South Elgin HS

The work includes, but is not limited to, the installation of a 432 SF Pressbox to an existing bleacher, associated electrical, new field lights, and track repair. Refer to the Drawings and Project Manual for the full extent of the Work that will be required.
  Project Manual (click to expand/collapse)
Name Size
Project Manual 10.1 MB