Village of Beecher - Gould St. Water Main Replacement

The proposed construction consists of replacing approximately 2,785 lineal feet of 8-inch and 444 lineal feet of 10-inch diameter water main by horizontal directional drilling and open cut methods including two railroad crossings. The proposed route includes installing new water main along Gould Street, from Indiana Avenue to Miller Street. Construction includes fire hydrants, valves, water service replacements, street and parkway restoration, and other miscellaneous items of work.

Status

Accepting Bids

Bid Date6/4/19 11:00 am

Company & Contacts

Baxter & Woodman - Chicago

Peter Kozak (pkozak@baxterwoodman.com)   815-444-3394

BID DUE DATE:
Tuesday, June 4, 2019 – 11:00AM
Village of Beecher – Village Hall
625 Dixie Highway, Beecher, IL 60401

PRINTED SETS: $75.00 NON-REFUNDABLE DEPOSIT
PAYABLE TO: BAXTER & WOODMAN INC.

CHECK MUST BE RECEIVED BY BHFX BEFORE YOUR DOCUMENTS ARE SHIPPED
SEND CHECKS TO:
BHFX DIGITAL IMAGING
ATTN: PLAN ROOM
80 W. SEEGERS RD.
ARLINGTON HEIGHTS, IL 60005

DOWNLOADS: $35.00
PAYABLE TO: BHFX (CHARGED TO A CREDIT CARD OR BHFX HOUSE ACCOUNT)

Outside Plan Rooms may purchase the Bidding Documents. HOWEVER, before they do, they MUST send an email to pkozak@baxterwoodman.com stating they will NOT copy, sell, or otherwise distribute the Bidding Documents. B&W’s Project Manager will inform BHFX when any Plan Room complies with this requirements.