New Trier THSD 2013 - 2019 Security Renovations at New Trier HS Northfield Campus BP 2

The general scope of work includes exterior and interior new construction and renovations related to exterior security fencing, landscaping and two limited interior renovations to create secure entry vestibules

Status

Accepting Bids

Prebid Date6/26/19 9:30 am

Bid Date7/2/19 12:00 pm

Company & Contacts

Pepper Construction - Barrington IL

Jenny Spence (jspence@pepperconstruction.com)   847-620-4179

Location

New Trier HS (Northfield Campus) - 7 Happ Rd., Northfield, IL 60093

The scope of work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary for completion of the work indicated in the Bid Documents including, but not necessarily limited to, the following: cutting and patching, selective demolition, self-leveling underlayment, metal fabrications, rough carpentry, solid surface sills, thermal insulation, penetration firestopping, joint sealants, non-structural metal framing, gypsum board, acoustical panel ceilings, interior painting, high-performance coatings, visual display units, fire suppression, plumbing, heating, ventilating and air conditioning, electrical, structured cabling for voice and data, extension of existing intercom, extension of existing fire alarm, chain link fencing, decorative metal fencing, turf grasses and landscaping

BID DUE DATE:
Tuesday, July 2, 2019 – 12:00PM
New Trier Township HS – Northfield Campus
Room A105
Attn: Mr. Jim Maile
7 Happ Rd., Northfield, IL 60093

PRE-BID MEETING: MANDATORY
Wednesday, June 26, 2019 – 9:30AM
New Trier Township HS – Northfield Campus
Room C234
7 Happ Rd., Northfield, IL 60093

Bidders are responsible for purchasing Printed Sets
Complete Downloads are available at no cost to Bidders

Bid Documents are NOT available to Plan Rooms through BHFX