Rich Township HSD 227 - Controls Upgrades at Rich South HS BP 4

The general scope of work includes the removal and replacement of DMS 3 Panel and DMS 4 Panel and upgrade to a portion of the building's temperature control system to a new Tridium N4 System. The removal and replacement of architectural finishes complete as-required to perform the controls upgrades, new wiring for sensors, new communication trunk, controllers, thermostat/sensor replacement, etc. integration of the existing LON trunk from the existing Jace 2 into the new N4 Jace.

Status

Accepting Bids

Prebid Date9/11/19 8:00 am

Bid Date9/19/19 10:00 am

Company & Contacts

Pepper Construction - Barrington IL

Andrew House (ahouse@pepperconstruction.com)   847-620-4113

Location

Rich South HS - 5000 Sauk Trail, Richton Park, IL 60471

Bid Package:
BP #01 – Controls Upgrades

BID DUE DATE:
Thursday, September 19, 2019 – 10:00AM
Rich Township HSD 227
Attn: Mr. Kevin Baffoe
20550 S. Cicero Ave., Matteson, IL 60443

PRE-BID MEETING: NON-MANDATORY
Wednesday, September 11, 2019 – 8:00AM
Rich South HS
5000 Sauk Trail, Richton Park, IL 60471

Bidders are responsible for purchasing Printed Sets and/or Downloads

Bid Documents are NOT available to Plan Rooms through BHFX.