Kankakee SD 111 - 2021 Parking Lot Replacement at Edison Primary School

The work includes, but is not limited to, full depth removal and replacement of the parking lot asphalt, concrete sidewalks, and replacement of the existing water main. The Contractor is to implement a stormwater pollution and prevention plan (SWPPP) as required by the authority having jurisdiction and will be required to coordinate work with all utility companies and authority having jurisdiction. Work is to be awarded as a single contract. Refer to the Drawings and Project Manual for the full extent of the Work.

Status

Accepting Bids

Prebid Date10/13/21 11:30am

Bid Date10/22/21 10:00am

Company & Contacts

DLA Architects Ltd

Brian Pencak (b.pencak@dla-ltd.com)   847-742-4063

Location

Edison Primary School - 1991 E. Maple St., Kankakee, IL 60901

Bids are invited from pre-qualified Paving Contractors for the complete construction of this Project under one General Contract, including all trades as specified in the Project Manual

BID DUE DATE:
Friday, October 22, 2021 – 10:00AM
Kankakee SD 111 – Lincoln Cultural Center
Attn: Dr. Nicole Terrell-Smith
240 Warren Ave., Kankakee, IL 60901

PRE-BID MEETING:
Wednesday, October 13, 2021 – 11:30AM
Kankakee SD 111 – Lincoln Cultural Center
Room 217
240 Warren Ave., Kankakee, IL 60901

Bidders are responsible for the purchase of Printed Sets and Complete Downloads

Bid Documents are NOT available to Plan Rooms through BHFX