Bloomington-Normal Water Reclamation District - Clearview Pump Station & Force Main

The proposed construction consists of 1,300 L.F. of 4-inch min. I.D. HDD force main; wastewater pumping station including 6-foot diameter wet well and valve vault, 5- HP duplex submersible pumps, pump control panel, 35 kW natural gas generator, site restoration, HMA driveway, PCC pavement replacement, and other miscellaneous items of work.
Plans (click to expand/collapse)
Name Size
Plans 9.3 MB