Maine THSD 207 - 2026 Roofing Removal & Replacement at Maine West HS (400961)
The project scope involves Roofing Removal and Replacement on an educational facility, two stories in height, utilizing SBS modified bitumen roofing. The project encompasses approximately 23,275 square feet on the building listed above. Localized masonry sub-contract work will also be required so Roofing Contractors are encouraged to bring the appropriate sub-trades to the pre-bid meeting.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Project Manual | 4.9 MB |

