Village of Hillcrest - Priority 1A Water Main Improvements

The proposed construction consists of replacing existing water main with approximately 2,335 feet of 12-inch water main, 2,272 feet of 8-inch water main, 20 feet of 6-inch water main, 32 feet of 4-inch water main, 20 gate valves, 16 valve boxes, 6 valve vaults, 13 fire hydrants, 2 pressure connections, 6 non-pressure connections, abandonment of existing water main, surface restoration, and other miscellaneous items of work.
Addendum #1 (click to expand/collapse)
Name Size
Addendum #1 712.6 KB
Addendum #2 (click to expand/collapse)
Name Size
Addendum #2 200.4 KB