City of Elmhurst - 2024 Sanitary Sewer Improvements & Force Main Replacements

The proposed construction consists of replacement of approximately 4,280 lineal feet of sanitary sewer with 24-inch sanitary sewer, including replacement of approximately 365 lineal feet of 24-inch storm sewer, via open cut methods; installation of approximately 4,370 lineal feet of 8-inch force main via horizontal directional drilling; approximately 1,850 lineal feet of 12-inch and 3,640 lineal feet of 16-inch force main lining; installation of approximately 280 lineal feet of 12-inch force main and 100 lineal feet of 16-inch force main by open cut methods; and fiber optic installation via horizontal directional drilling; including new structures, SCADA integration, and other miscellaneous items of work.
Plans (click to expand/collapse)
Name Size
Plans 12.8 MB