Harper College - 2024 Sidewalk & Concrete Maintenance

The project includes (but is not limited to) the following: mobilization, site preporation, demolition, asphalt paving, concrete paving, permeable pavers, and storm utility drainage
Specifications (click to expand/collapse)
Name Size
Project Manual 46.4 MB