Public Projects

Bids due in 25 days
12/16/25 11:00am CST
Harper College - 2025 OSHA Roof Safety Improvements
Bids due in 25 days
Legat Architects - Gurnee
Harper College - 1200 W. Algonquin Rd., Palatine, IL 60067
Work includes (but is not limited to) the following: Interior Safety and Exterior Roof Safety. Including a new roof hatch with electric hoist on the roof. Minor structural, mechanical and electrical required for the new hatch and hoist
Bids due in 25 days
12/16/25 11:00am CST
Harper College - Building A-E Fiber Optic Cabling Replacement
Bids due in 25 days
FGM Architects Inc.
Harper College - 1200 W. Algonquin Rd., Palatine, IL 60067
The Work consists of the replacement of the existing fiber optic cabling between existing Buildings A and E on the existing campus in Palatine, Illinois.
Bids due in 26 days
12/17/25 11:00am CST
Harper College - Building Q ESTC Septic Field
Bids due in 26 days
FGM Architects Inc.
Harper College - 1200 W. Algonquin Rd., Palatine, IL 60067
The Work consists of the installation of a septic field for Building Q – Emergency Services Training Center (ESTC) on the existing campus in Palatine, Illinois.
Bidding Closed
11/18/25 11:00am CST
Harper College - Building X Dental Lab Improvements
Bidding Closed
DBH & Associates Architects Inc.
Harper College - 1200 W. Algonquin Rd., Palatine, IL 60067
Bids due in 13 days
12/4/25 2:30pm CST
Maine THSD 207 - 2026 Masonry Remediation at Maine South HS (400962)
Bids due in 13 days
Inspec
Maine South HS - 1111 S. Dee Rd., Park Ridge, IL 60068
The project scope involves masonry repair and restoration as well as cast-in-place concrete repair and coating on nine (9) selected elevations on the “A-Wing” of Maine South High School. The project will encompass approximately 12,000 square feet of masonry wall surface and 4,900 square feet of cast-in-place concrete surface over 9 elevations of the building. Prime Masonry Contractors are encouraged to bring the appropriate sub-trades to the pre-bid meeting.
Bids due in 13 days
12/4/25 2:00pm CST
Maine THSD 207 - 2026 Roofing Removal & Replacement at Maine East HS (400960)
Bids due in 13 days
Inspec
Maine East HS - 2601 Dempster St., Park Ridge, IL 60068
The project scope involves Roofing Removal and Replacement on an educational facility, varying number of stories, utilizing SBS modified bitumen roofing. The project encompasses approximately 22,200 square feet on the building listed above.
Bids due in 13 days
12/4/25 2:00pm CST
Maine THSD 207 - 2026 Roofing Removal & Replacement at Maine West HS (400961)
Bids due in 13 days
Inspec
Maine West HS - 1755 S. Wolf Rd., Des Plaines, IL 60018
The project scope involves Roofing Removal and Replacement on an educational facility, two stories in height, utilizing SBS modified bitumen roofing. The project encompasses approximately 23,275 square feet on the building listed above. Localized masonry sub-contract work will also be required so Roofing Contractors are encouraged to bring the appropriate sub-trades to the pre-bid meeting.
Bids due in 53 days
1/13/26 1:00pm CST
Marengo CHSD 154 - 2026 Concessions Stand Roofing Replacement at Marengo Community HS
Bids due in 53 days
GreenAssociates
Marengo Community HS - 110 Franks Rd., Marengo, IL 60152
Project consists of roofing replacement at the sports complex concessions stand and associated work as indicated on Drawings.
Bids due in 13 days
12/4/25 10:00am CST
Marseilles ESD 150 - 2026 Roof Replacement at Marseilles ES
Bids due in 13 days
GreenAssociates
Marseilles ES - 201 Chicago St., Marseilles, IL 61341
Project consists of remove, completely tear-off and provide new roof and associated sheet metal and other Work indicated in the Contract Documents.
Bids due in 20 days
12/11/25 2:00pm CST
Midway Village Museum - Industrial Building Toilet Remodeling
Bids due in 20 days
Hagney Architects
Midway Village Museum - 6799 Guilford Rd., Rockford, IL 61107
The scope of this project involves the complete remodeling of the Midway Village Museum Industrial Building (Main Museum Building) Toilet Rooms at 6799 Guilford Road in Rockford, Illinois. This includes all demolition and new work required to make the restrooms ADA compliant and update the spaces. Work includes new layout for new plumbing fixtures, countertops, new concrete block walls as shown, new doors/frames/hardware, new ceramic floor tile, new toilet accessories, new electrical, and drinking fountain.