Public Projects

Bids Due in 44 days
7/8/25 10:00am CDT
Bloomington-Normal Water Reclamation District - Digester & CHP Improvements
Bids Due in 44 days
Baxter & Woodman - Naperville
The Project includes the following Work: Replacement of the Primary and Secondary Digester covers; construction of proposed Primary Digester No. 3 with cover, expansion of the Digester Control Building, and access drives; relocation and replacement of sludge recirculation pumps, primary sludge transfer pumps, boiler/heat exchanger and addition of a second boiler/heat exchanger, and hydronic system; demo of the Primary Digester mixing system and installation of proposed jet mixing system for all three digesters; installation of recirculation piping, gas take-off piping, and feed sludge piping to all three digesters; installation of proposed CHP system and gas treatment system; construction of proposed FOG/HSW Receiving Station and access drive; installation of FOG/HSW pumps, FOG/HSW macerator, and FOG/HSW submersible mixers; and associated plumbing, electrical, instrumentation, HVAC, and other miscellaneous items of work
Bids Due in 4 days
5/29/25 10:00am CDT
Buffalo Grove Park District - Mike Rylko Amphitheater Access Road
Bids Due in 4 days
Buffalo Grove Park District
Mike Rylko Park Amphitheater - 951 McHenry Rd., Buffalo Grove, IL 60089
The project consists of full-depth removal of the access drive north of the Buffalo Grove Fitness Center (601 Deerfield Parkway, Buffalo Grove, IL 60089) and a reconstruction connecting it to the north-south pathway nearby. Due to grading concerns on the site, a retaining wall and an underdrain will also be installed to adequately accommodate the substantial changes in grade.
Bids Due in 4 days
5/29/25 11:00am CDT
Chicago Heights Park District - 2025 Site Improvements at Commissioners Park
Bids Due in 4 days
DLA Architects Ltd
Commissioners Park - 311 Chicago Rd., Chicago Heights, IL 60411
The project includes, but is not limited to, the following: regrading, removal/replacement of concrete flatwork, new exterior sports lighting, water to waste splashpad, fencing, soccer goals, relocation of storm structure(s) and associated underground lines. Refer to the drawings and project manual for the full scope of work.
Bids Due in 19 days
6/13/25 10:00am CDT
Chicago Rockford Int'l Airport - Construct Group VI Aircraft Pavement Modifications
Bids Due in 19 days
Crawford Murphy & Tilly Inc.
Chicago Rockford Int'l Airport - Taxiway A & South Cargo Apron - 60 Airport Dr., Rockford, IL 61109
The project consists of pavement removals, unclassified excavation and embankment construction, earthwork and grading, drainage, paving, lighting, electrical, security fencing, pavement marking, erosion control, various utility removals, topsoiling and landscaping, as well as all incidental and collateral work necessary to complete the improvements shown on the plans and as described herein.
Bids Due in 15 days
6/9/25 11:00am CDT
City of Loves Park - Well No. 7 Water Treatment Facility
Bids Due in 15 days
Baxter & Woodman Inc. - Mokena
The proposed construction consists of 2,000 gpm well pumping equipment with pitless adapter, masonry structure, installation of pressure filtration units and steel stairs and platforms pre-purchased by the City, chemical feed systems, HVAC, controls and instrumentation, emergency generator, utilities, site and civil improvements, pavement, and other miscellaneous items of work
Bids Due in 9 days
6/3/25 10:00am CDT
City of McHenry - Broad St. Richmond Rd & Mill St. Water Main Replacement
Bids Due in 9 days
Baxter & Woodman Inc. - Mokena
The proposed construction consists of installing approximately 980 lineal feet of 8-inch and 1,290 lineal feet of 12-inch water main via directional drilling and open cut methods, including new hydrants, valves and other miscellaneous items of work. The contract will include all work necessary to install the water main, install water service lines via directional drilling or open cut methods, completely replace lead service lines, reconnect existing water service lines, restore the roadway, and perform all restoration to return the area to its original condition.
Bids Due in 10 days
6/4/25 10:30am CDT
City of Rolling Meadows - Park Street Storm Sewer Improvements Phase 3
Bids Due in 10 days
WBK Engineering LLC
The Contract work shall consist of furnishing all materials, labor, equipment, etc. required to install approximately 2,000 linear feet of storm sewer ranging in size from 8-inch to 24-inch, storm manholes, catch basins, inlets, miscellaneous water and sanitary sewer service removal and replacements, pavement patching, grind and overlay, concrete curb and gutter removal and replacement, sidewalk removal and replacement, and parkway restoration, and all other incidental work necessary to complete this improvement along Park Street in the City of Rolling Meadows.
Bids Due in 8 days
6/2/25 10:00am CDT
Community Utilities of Indiana - 2025 Twin Lakes Sanitary Sewer System Rehabilitation
Bids Due in 8 days
Baxter & Woodman Inc. - Mokena
The proposed construction consists of one (1) service lateral point repair, 280 LF of 4” service lateral CIPP in Twin Lakes Basin 7, one (1) sanitary sewer point repair, and other miscellaneous items of work.
Bids Due in 11 days
6/5/25 3:00pm CDT
Harlem CSD 122 - 2025 Auditorium Re-Lighting at Harlem HS REBID
Bids Due in 11 days
Hagney Architects
Harlem HS - 1 Huskie Circle, Machesney Park, IL 61115
Replacement of auditorium lighting at Harlem High School and other Work indicated in the Contract Documents.
Bids Due in 11 days
6/5/25 3:15pm CDT
Harlem CSD 122 - 2025 Cooler Replacement at Harlem MS
Bids Due in 11 days
Hagney Architects
Harlem MS - 735 Windsor Rd., Loves Park, IL 61111
The scope of the project involves the removal and replacement of the walk-in cooler attached to the kitchen, at Harlem Middle School in Loves Park, IL. This work shall include the removal of the existing slab and replacing it with a new slab and bollards and a new walk-in cooler, with TPO roof with flashings. The Contractor shall provide all electrical, plumbing, mechanical, and structural work necessary to make a complete installation per manufacturer’s requirements, and to comply with all building and health codes.