Inverness Park District - Tot Lot and Fitness Equipment Installation at North Park

Inverness Park District is accepting sealed bids for the Inverness Park District Fitness and Tot Lot Project, which includes coordination of delivery and unloading of Fitness and Playground Equipment purchased by the Park District at the site, earthwork with erosion control measures as required by Park District, Village of Inverness and Cook County, temporary security fencing, excavation, shaping and compaction, foundations for fitness and playground equipment, assembly and installation of equipment, coordination of installation of safety surfacing subbase and surfacing purchased and contracted separately by the Park District, and site turf restoration.

Status

Bidding Closed

Prebid Date7/11/24 11:00am CDT

Bid Date7/18/24 11:00am CDT

Company & Contacts

3D Design Studio
Dan Dalziel  
847-366-4855

Location

Inverness Park District - North Park - 300 N. Highland Rd., Inverness, IL 60067

The North Park Tot Lot and Fitness Equipment Project consists of two separate construction areas:

1. Performing the removal of timber edging for an existing playground with some of the existing wood mulch safety surfacing, installation of access concrete walk and playground ramp, playground perimeter concrete curbing, new poured in place safety surfaces and tot playground equipment.

2. Adjoining the existing new loop trail north of the Park District headquarters, installing concrete curbing, fitness equipment pieces and poured in place safety surfacing.

BID DUE DATE:
Thursday, July 18, 2024 – 11:00AM
Inverness Park District
Attn: Nancy DiGioia, Lucia Flanagan
300 N. Highland Rd., Inverness, IL 60067

PRE-BID MEETING: STRONGLY ENCOURAGED
Thursday, July 11, 2024 – 11:00AM
Inverness Park District
300 N. Highland Rd., Inverness, IL 60067

Bidders are responsible for complete printed sets and/or complete downloads

Bid Documents are available to Plan Rooms through BHFX
Please contact BHFX to request files