Bloomington-Normal Water Reclamation District - Clearview Pump Station & Force Main
The proposed construction consists of 1,300 L.F. of 4-inch min. I.D. HDD force main; wastewater pumping station including 6-foot diameter wet well and valve vault, 5- HP duplex submersible pumps, pump control panel, 35 kW natural gas generator, site restoration, HMA driveway, PCC pavement replacement, and other miscellaneous items of work.
Specifications
(click to expand/collapse)
Name | Size | ||
Project Manual | 9.9 MB |