Lyons THSD 204 - 2025 Softball Field Replacement at South Campus

The Work shall take place at South Campus. The Work includes, but is not limited to, the removal of existing softball field/fencing/dugouts, construction of new synthetic turf softball field, dugouts, netting, scoreboard, lighting, pressbox, grandstand and concrete.
Plans (click to expand/collapse)
Name Size
01_G0.1 406.6 KB
02_C-1.0 371.7 KB
03_C-1.1 304.8 KB
04_C-2.0 353.5 KB
05_C-3.0 398.4 KB
06_C-3.1 570.8 KB
07_C-4.0 603.9 KB
08_C-4.1 472.8 KB
09_C-5.0 516.8 KB
10_C-5.1 349.8 KB
11_C-5.2 1.2 MB
12_C-6.0 529.3 KB
13_C-6.1 412.5 KB
14_C-6.2 1.1 MB
15_C-7.0 527.1 KB
16_C-7.1 2.9 MB
17_EX-1.0 312.0 KB
18_EX-2.0 613.5 KB
19_EX-MWRD 1.6 MB
20_SUR-1 830.4 KB
21_SUR-2 809.4 KB
22_SUR-3 598.3 KB
23_SUR-4 471.5 KB
24_SUR-5 515.6 KB
25_SUR-6 605.0 KB
26_SUR-7 802.2 KB
27_AS1.1 921.6 KB
28_AS1.2 437.0 KB
29_AS1.3 459.9 KB
30_AS1.4 238.1 KB
31_AS1.5 713.0 KB
32_AS1.6 328.9 KB