Bloomington-Normal Water Reclamation District - Plant 3 Headworks Improvements

The proposed construction consists of: Major rehabilitation of the existing Plant 3 Headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60” screw pumps will be replaced and one new 60” screw pump will be installed at the Far West Sewer Pump Station. New HVAC will be provided for the Plant 3 Headworks buildings (Screen Room, Washer-Compactor Room, Electrical Room, and Grit Washer Room) and gas safety equipment will be installed in Classified areas. A Manual Bar Rack Channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.

Status

Accepting Bids

Prebid Date 12/18/25 10:00am CST
Bid Date 1/16/26 2:00pm CST

Company & Contacts

Baxter & Woodman - Chicago
Mark Gockowski  
815-444-4960

BID DUE DATE:
Friday, January 16, 2026 – 2:00PM
Bloomington-Normal Water Reclamation District
Board Room
2015 W. Oakland Ave., Bloomington, IL 61701

PRE-BID MEETING: MANDATORY
Thursday, December 18, 2025 – 10:00AM
Bloomington-Normal Water Reclamation District
West WWTP
2015 W. Oakland Ave., Bloomington, IL 61701

PRINTED SETS: $175.00 NON-REFUNDABLE DEPOSIT
PAYABLE TO: BAXTER & WOODMAN INC.

CHECK MUST BE RECEIVED BY BHFX BEFORE YOUR DOCUMENTS ARE SHIPPED
SEND CHECKS TO:
BHFX DIGITAL IMAGING
ATTN: PLAN ROOM
80 W. SEEGERS RD.
ARLINGTON HEIGHTS, IL 60005

DOWNLOADS: $100.00
PAYABLE TO: BHFX (CHARGED TO A CREDIT CARD OR BHFX HOUSE ACCOUNT)

Outside Plan Rooms may purchase the Bidding Documents. HOWEVER, before they do, they MUST send an email to mgockowski@baxterwoodman.com stating they will NOT copy, sell, or otherwise distribute the Bidding Documents. B&W's Project Manager will inform BHFX when any Plan Room complies with this requirement.