Valley View CUSD 365U - 2026 Gym & Lobby Roof Replacement at Romeoville HS

The work includes but is not limited to Base Bid (Roof 5), the complete removal of existing roof assembly down to substrate and replacement with new single-ply EPDM membrane roof replacement system, perimeter metal coping and trim systems and all associated work as indicated in the drawings and specifications. Deduct Alternate #1 (Roof 2C) work to include complete removal of existing roof system down to substrate, installation of new single-ply EPDM membrane roof system in areas as indicated on plans and all associated work as indicated in the drawings.

Status

Accepting Bids

Prebid Date 1/15/26 10:30am CST
Bid Date 1/21/26 8:30am CST

Company & Contacts

DLA Architects Ltd
Otniel Tigu  
773-659-9323

Location

Romeoville HS - 100 N. Independence Blvd., Romeoville, IL 60446

Bids are invited from pre-qualified General Contractors for the complete construction of this Project under one General Contract, including all trades as specified in the Project Manual

BID DUE DATE:
Wednesday, January 21, 2026 - 8:30AM
Valley View CUSD 365U – Administration Center
Attn: Mr. Mike Lopez
801 Normantown Rd., Romeoville, IL 60446

PRE-BID MEETING: NON-MANDATORY
Thursday, January 15, 2026 - 10:30AM
Romeoville HS – Main Entrance
100 N. Independence Blvd., Romeoville, IL 60446

Bidders are responsible for the purchase of Complete Printed Sets and Complete Downloads

Bid Documents are NOT available to Plan Rooms through BHFX