Valley View CUSD 365U - 2026 Gym & Lobby Roof Replacement at Romeoville HS
The work includes but is not limited to Base Bid (Roof 5), the complete removal of existing roof assembly down to substrate and replacement with new single-ply EPDM membrane roof replacement system, perimeter metal coping and trim systems and all associated work as indicated in the drawings and specifications. Deduct Alternate #1 (Roof 2C) work to include complete removal of existing roof system down to substrate, installation of new single-ply EPDM membrane roof system in areas as indicated on plans and all associated work as indicated in the drawings.
Status
Accepting Bids
| Prebid Date | 1/15/26 10:30am CST |
| Bid Date | 1/21/26 8:30am CST |
Location
Romeoville HS - 100 N. Independence Blvd., Romeoville, IL 60446
Bids are invited from pre-qualified General Contractors for the complete construction of this Project under one General Contract, including all trades as specified in the Project Manual
BID DUE DATE:
Wednesday, January 21, 2026 - 8:30AM
Valley View CUSD 365U – Administration Center
Attn: Mr. Mike Lopez
801 Normantown Rd., Romeoville, IL 60446
PRE-BID MEETING: NON-MANDATORY
Thursday, January 15, 2026 - 10:30AM
Romeoville HS – Main Entrance
100 N. Independence Blvd., Romeoville, IL 60446
Bidders are responsible for the purchase of Complete Printed Sets and Complete Downloads
Bid Documents are NOT available to Plan Rooms through BHFX

