Valley View CUSD 365U - 2026 Gym & Lobby Roof Replacement at Romeoville HS

The work includes but is not limited to Base Bid (Roof 5), the complete removal of existing roof assembly down to substrate and replacement with new single-ply EPDM membrane roof replacement system, perimeter metal coping and trim systems and all associated work as indicated in the drawings and specifications. Deduct Alternate #1 (Roof 2C) work to include complete removal of existing roof system down to substrate, installation of new single-ply EPDM membrane roof system in areas as indicated on plans and all associated work as indicated in the drawings.