Harrison SD 36 - Site Work & Utilities for Moblie Classrooms at Harrison School

The work includes, but is not limited to, site work and utility work to accommodate a new 6,807 square foot Mobile classroom. The mobile classroom unit will be installed by the mobile classroom manufacturer under a separate contract. Bids are being solicited for the site work, underground utility work, electrical and plumbing as shown on the drawings.
Plans (click to expand/collapse)
Name Size
01_G0.1 2.1 MB
02_T-1.0 589.4 KB
03_C-1.0 515.7 KB
04_C-2.0 272.7 KB
05_C-3.0 371.1 KB
06_C-3.1 424.4 KB
07_C-4.0 701.1 KB
08_C-5.0 586.0 KB
09_C-5.1 2.0 MB
10_C-6.0 960.1 KB
11_C-6.1 2.5 MB
12_C-7.0 825.2 KB
13_C-7.1 835.4 KB
14_SUR-1 1.0 MB
15_AS1.1 783.5 KB
16_A1.1 1.0 MB
17_P1.1 1.1 MB
18_P2.1 937.8 KB
19_E1.1 793.2 KB
20_E2.1 866.7 KB
21_E3.0 538.0 KB
22_E4.0 1.1 MB
23_C1 1.9 MB
24_A1 412.6 KB
25_E1 2.0 MB
26_S1 346.9 KB
27_S2 390.6 KB