Harper College - 2025 Asphalt Pavement Maintenance REBID

The project includes (but is not limited to) the following: mobilization, site preparation, demolition, asphalt paving, pavement striping, concrete curb & gutter, and storm utility drainage.
Plans (click to expand/collapse)
Name Size
01_C0.0 497.7 KB
02_C0.1 203.1 KB
03_C1.0 1.2 MB
04_C1.01 205.4 KB
05_C1.02 240.9 KB
06_C1.03 247.9 KB
07_C1.04 172.5 KB
08_C1.05 230.2 KB
09_C1.06 327.4 KB
10_C1.07 289.5 KB
11_C1.08 249.6 KB
12_C1.09 229.0 KB
13_C1.10 534.2 KB
14_C1.11 456.0 KB
15_C1.12 404.6 KB
16_C1.13 211.4 KB
17_C1.14 307.2 KB
18_C1.15 386.9 KB
19_C1.16 276.5 KB
20_C1.17 176.9 KB
21_C1.18 217.8 KB
22_C1.19 217.0 KB
23_C1.20 232.3 KB
24_C2.0 568.8 KB