Harper College - 2025 Stair & Retaining Wall Maintenance
The project includes (but is not limited to) the following: mobilization, site preparation, demolition, excavation, concrete foundation and flatwork, utility work, landscaping, and restoration.
Plans
(click to expand/collapse)

Name | Size | ||
01_C0.0 | 427.3 KB | ||
02_C0.1 | 188.9 KB | ||
03_C1.0 | 418.0 KB | ||
04_C2.0 | 247.6 KB | ||
05_C3.0 | 355.1 KB | ||
06_C4.0 | 411.5 KB | ||
07_C4.1 | 609.6 KB | ||
08_C5.0 | 440.9 KB | ||
09_C6.0 | 229.4 KB | ||
10_L1.0 | 250.9 KB | ||
11_L1.1 | 327.5 KB | ||
12_L2.1 | 311.0 KB | ||
13_L2.2 | 295.1 KB | ||
14_L2.3 | 173.0 KB | ||
15_L3.0 | 463.5 KB | ||
16_L4.0 | 211.0 KB | ||
17_L4.1 | 187.9 KB | ||
18_L5.0 | 303.3 KB | ||
19_L5.1 | 308.9 KB | ||
20_L5.2 | 242.6 KB | ||
21_S0.0 | 605.7 KB | ||
22_S0.1 | 583.4 KB | ||
23_S1.1 | 652.5 KB |