Marengo-Union ECSD 165 - 2026 Renovations at Locust ES

The project consists of renovations to the Main gym & stage area, small gym and four classrooms. The existing Stage will be renovated into two new classrooms, Art and Music. New ADA ramp added to stage area. Miscellaneous other work including new HVAC and lighting in Gyms, stage areas & Classrooms is required. New toilet partitions, plumbing fixtures and suspended ceiling and HVAC in Staff toilet. The project includes significant replacement to the existing HVAC system, including the removal and replacement of the ceiling and lighting in the renovated areas. The project includes general construction plus equipment, plumbing, HVAC and electrical work.
Plans (click to expand/collapse)
Name Size
01-G1 533.7 KB
02-D101A 2.6 MB
03-D101B 4.0 MB
04-A101A 823.6 KB
05-A101B 806.7 KB
06-A201 289.5 KB
07-S001 251.2 KB
08-S101 300.0 KB
09-M001 575.4 KB
10-M101A 293.0 KB
11-M101B 296.5 KB
12-M101C 248.4 KB
13-M102 165.4 KB
14-M201A 289.0 KB
15-M201B 281.3 KB
16-M202 159.2 KB
17-M301 159.1 KB
18-M401 236.6 KB
19-M402 169.4 KB
20-M601 543.2 KB
21-E001 327.9 KB
22-E101A 336.5 KB
23-E101B 363.8 KB
24-E201A 328.8 KB
25-E201B 355.1 KB
26-E301 242.8 KB
27-E401 1.0 MB
28-E402 1.4 MB