Riverside SD 96 - 2025 Window Replacement at Hauser JHS
The Work consists of the following: The work includes, but is not limited to, the complete removal and disposal of all windows as indicated, and the installation of new aluminum frame insulated windows at Hauser Jr. High School and all work as indicated in the drawings and specifications. Refer to the Drawings and Project Manual for the full extent of the Work.
Plans
(click to expand/collapse)
(click to expand/collapse)

