Village of Park Forest - Tamarack Standpipe Repainting & Maintenance
The proposed construction consists of repainting the interior and exterior metal surfaces of a 3,000,000-gallon water storage standpipe including surface preparation, collection and disposal of surface preparation debris, and painting; installation of mixing system and other miscellaneous items of work
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Project Manual | 15.0 MB |

