Rochelle THSD 212 - 2026 Site Improvements at Rochelle Township HS

Project consists of the removal and replacement of asphalt, concrete curb and gutter, concrete sidewalk, grading, site restoration, pavement striping, and associated work as identified here-in.
Plans (click to expand/collapse)
Name Size
01_COVER 154.6 KB
02_C-001 920.0 KB
03_C-002 424.5 KB
04_C-003 326.4 KB
05_C-004 385.6 KB
06_C-005 374.7 KB
07_C-006 360.1 KB
08_C-100 408.5 KB
09_C-101 558.7 KB
10_C-102 430.6 KB
11_C-103 356.4 KB
12_C-200 457.9 KB
13_C-201 613.0 KB
14_C-202 426.2 KB
15_C-203 473.0 KB
16_C-300 396.4 KB
17_C-301 584.6 KB
18_C-302 435.4 KB
19_C-400 2.2 MB
20_C-401 1.0 MB
21_C-402 398.3 KB