Harper College - 2026 Sidewalk Maintenance

The project includes (but is not limited to) the following: mobilization, site preparation, demolition, excavation, concrete foundation and flatwork, utility work, landscaping, and restoration
Plans (click to expand/collapse)
Name Size
01_C0.0 619.5 KB
02_C0.1 470.8 KB
03_C1.0 1.1 MB
04_C1.01 318.5 KB
05_C1.02 421.7 KB
06_C1.03 383.2 KB
07_C1.04 347.1 KB
08_C1.05 335.1 KB
09_C1.06 484.8 KB
10_C1.07 432.3 KB
11_C1.08 362.5 KB
12_C1.09 324.6 KB
13_C1.10 743.3 KB
14_C1.11 646.6 KB
15_C1.12 565.9 KB
16_C1.13 303.4 KB
17_C1.14 473.9 KB
18_C1.15 532.4 KB
19_C1.16 386.4 KB
20_C1.17 246.7 KB
21_C1.18 318.7 KB
22_C1.19 313.0 KB
23_C1.20 319.5 KB
24_C2.0 282.4 KB