Harper College - 2026 Sidewalk Maintenance
The project includes (but is not limited to) the following: mobilization, site preparation, demolition, excavation, concrete foundation and flatwork, utility work, landscaping, and restoration
Plans
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01_C0.0 | 619.5 KB | ||
| 02_C0.1 | 470.8 KB | ||
| 03_C1.0 | 1.1 MB | ||
| 04_C1.01 | 318.5 KB | ||
| 05_C1.02 | 421.7 KB | ||
| 06_C1.03 | 383.2 KB | ||
| 07_C1.04 | 347.1 KB | ||
| 08_C1.05 | 335.1 KB | ||
| 09_C1.06 | 484.8 KB | ||
| 10_C1.07 | 432.3 KB | ||
| 11_C1.08 | 362.5 KB | ||
| 12_C1.09 | 324.6 KB | ||
| 13_C1.10 | 743.3 KB | ||
| 14_C1.11 | 646.6 KB | ||
| 15_C1.12 | 565.9 KB | ||
| 16_C1.13 | 303.4 KB | ||
| 17_C1.14 | 473.9 KB | ||
| 18_C1.15 | 532.4 KB | ||
| 19_C1.16 | 386.4 KB | ||
| 20_C1.17 | 246.7 KB | ||
| 21_C1.18 | 318.7 KB | ||
| 22_C1.19 | 313.0 KB | ||
| 23_C1.20 | 319.5 KB | ||
| 24_C2.0 | 282.4 KB |

