Harper College - 2026 LCC Parking Lot Reconstruction Phase 2

The project includes (but is not limited to) the following: mobilization, site preparation, demolition, excavation, concrete foundation and flatwork, utility work, landscaping, and restoration
Plans (click to expand/collapse)
Name Size
01_C0.0 1.1 MB
02_C0.1 356.4 KB
03_C0.2 338.1 KB
04_C1.0 560.0 KB
05_C2.0 1.6 MB
06_C2.1 861.4 KB
07_C3.0 1.2 MB
08_C3.1 676.1 KB
09_C3.2 1.7 MB
10_C3.3 610.3 KB
11_C4.0 860.2 KB
12_C5.0 1.3 MB
13_C5.1 529.0 KB
14_C5.2 616.3 KB
15_C6.0 1.4 MB
16_C7.0 1.2 MB
17_C8.0 573.3 KB
18_C8.1 685.1 KB
19_C8.2 1.6 MB
20_C8.3 702.5 KB
21_C8.4 2.0 MB
22_C8.5 1.1 MB
23_C8.6 2.5 MB
24_C8.7 1.3 MB
25_L2.1 364.4 KB
26_L2.2 498.8 KB
27_L2.3 213.3 KB
28_E1.0 133.9 KB
29_E1.1 147.5 KB
30_E.12 122.8 KB
31_E.13 175.1 KB
32_E1.4 134.3 KB
33_ED1.0 100.6 KB
34_EP0.0 626.2 KB