Harper College - 2026 Campus Safety Bollards
The project includes (but is not limited to) the following: Mobilization, site preparation, demolition, excavation, bollard installation, concrete foundation and flatwork, utility work, landscaping, and restoration
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Addendum #1 | 131.2 KB |
Addendum #2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Addendum #2 | 136.9 KB |

