Lyons THSD 204 - 2025 Softball Field Replacement at South Campus

The Work shall take place at South Campus. The Work includes, but is not limited to, the removal of existing softball field/fencing/dugouts, construction of new synthetic turf softball field, dugouts, netting, scoreboard, lighting, pressbox, grandstand and concrete.
Specifications (click to expand/collapse)
Name Size
Project Manual 6.5 MB