Harlem CSD 122 - 2025 Cooler Replacement at Harlem MS

The scope of the project involves the removal and replacement of the walk-in cooler attached to the kitchen, at Harlem Middle School in Loves Park, IL. This work shall include the removal of the existing slab and replacing it with a new slab and bollards and a new walk-in cooler, with TPO roof with flashings. The Contractor shall provide all electrical, plumbing, mechanical, and structural work necessary to make a complete installation per manufacturer’s requirements, and to comply with all building and health codes.

Status

Accepting Bids

Bid Date 6/5/25 3:15pm CDT

Company & Contacts

Hagney Architects
David Hagney  
815-397-3330

Location

Harlem MS - 735 Windsor Rd., Loves Park, IL 61111

Bids will be received for the following Work:
1. General Contract (all trades).

BID DUE DATE:
Thursday, June 5, 2025 - 3:15PM
Harlem CSD 122 – Administration Center
Attn: Josh Aurand CSBO
8605 N. 2nd St., Machesney Park, IL 61115

SITE WALKTHROUGH:
A site walkthrough can be scheduled by contacting the Director of Operations, Mr. Mike Chandler, at (815) 654-4500

Bidders are responsible for the purchase of Printed Sets and / or Downloads

Bid Documents are available to Plan Rooms through BHFX
Please contact BHFX to request files