Harlem CSD 122 - 2025 Cooler Replacement at Harlem MS
The scope of the project involves the removal and replacement of the walk-in cooler attached to the kitchen, at Harlem Middle School in Loves Park, IL. This work shall include the removal of the existing slab and replacing it with a new slab and bollards and a new walk-in cooler, with TPO roof with flashings. The Contractor shall provide all electrical, plumbing, mechanical, and structural work necessary to make a complete installation per manufacturer’s requirements, and to comply with all building and health codes.
Project Manual
(click to expand/collapse)

Name | Size | ||
Project Manual | 33.0 MB |