Harper College - 2025 LCC Parking Lot Reconstruction Phase 1
The project includes (but is not limited to) the following: mobilization, site preparation, demolition, excavation, concrete work, paving, electrical work, utility work, landscaping, and restoration.
Plans
(click to expand/collapse)

Name | Size | ||
01_C0.0 | 550.4 KB | ||
02_C0.1 | 243.4 KB | ||
03_C0.2 | 241.7 KB | ||
04_C1.0 | 649.1 KB | ||
05_C2.0 | 1.0 MB | ||
06_C3.0 | 971.9 KB | ||
07_C4.0 | 464.7 KB | ||
08_C5.0 | 372.6 KB | ||
09_C6.0 | 839.4 KB | ||
10_C7.0 | 651.4 KB | ||
11_C8.0 | 580.4 KB | ||
12_C9.0 | 217.2 KB | ||
13_C10.0 | 374.4 KB | ||
14_C10.1 | 284.7 KB | ||
15_C10.2 | 717.8 KB | ||
16_C10.3 | 473.8 KB | ||
17_L1.1 | 254.7 KB | ||
18_L1.2 | 477.3 KB | ||
19_L1.3 | 471.6 KB | ||
20_E0.0 | 120.6 KB | ||
21_E0.1 | 148.7 KB | ||
22_E0.2 | 108.7 KB | ||
23_E0.3 | 117.4 KB | ||
24_E0.4 | 126.2 KB | ||
25_ED0.0 | 80.3 KB | ||
26_EP0.0 | 362.8 KB |