Harper College - 2025 LCC Parking Lot Reconstruction Phase 1
The project includes (but is not limited to) the following: mobilization, site preparation, demolition, excavation, concrete work, paving, electrical work, utility work, landscaping, and restoration.
Specifications
(click to expand/collapse)

Name | Size | ||
Project Manual | 6.3 MB |