Bloomington-Normal Water Reclamation District - Plant 3 Headworks Improvements

The proposed construction consists of: Major rehabilitation of the existing Plant 3 Headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60” screw pumps will be replaced and one new 60” screw pump will be installed at the Far West Sewer Pump Station. New HVAC will be provided for the Plant 3 Headworks buildings (Screen Room, Washer-Compactor Room, Electrical Room, and Grit Washer Room) and gas safety equipment will be installed in Classified areas. A Manual Bar Rack Channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.
Plans (click to expand/collapse)
Name Size
Plans 53.4 MB