Lockport THSD 205 - 2024 Ceiling Replacement at Lockport Township HS Central Campus
The project includes, but is not limited to, the following: the demolition and replacement of existing plaster ceiling assemblies with acoustic lay-in ceiling grid assemblies including select electrical, mechanical, plumbing, plaster repair, and structural repair work.
Addendum #1
(click to expand/collapse)
Name | Size | ||
Addendum #1 | 170.5 KB |
Addendum #2
(click to expand/collapse)
Name | Size | ||
Addendum #2 | 9.6 MB |
Addendum #3
(click to expand/collapse)
Name | Size | ||
Addendum #3 | 544.2 KB |