Lockport THSD 205 - 2024 Ceiling Replacement at Lockport Township HS Central Campus

The project includes, but is not limited to, the following: the demolition and replacement of existing plaster ceiling assemblies with acoustic lay-in ceiling grid assemblies including select electrical, mechanical, plumbing, plaster repair, and structural repair work.
Plans (click to expand/collapse)
Name Size
01_G0.1 329.3 KB
02_G0.2 1.7 MB
03_G0.3 760.0 KB
04_A8.0 318.1 KB
05_A8.1 427.7 KB
06_A8.1A 1.9 MB
07_A8.1B 563.9 KB
08_A8.2 631.0 KB
09_A8.2A 2.2 MB
10_A8.3 424.5 KB
11_A8.3A 1.1 MB
12_A8.4 409.4 KB
13_A8.5 329.6 KB
14_S1.2SCR 539.3 KB
15_S1.3SCR 512.3 KB
16_S1.4SCR 564.6 KB
17_S1.5SCR 522.8 KB
18_S2.1SCR 292.9 KB
19_S1.3WR 511.7 KB
20_S1.4WR 501.7 KB
21_S1.5WR 350.2 KB
22_S2.1WR 330.7 KB
23_S2.2WR 416.9 KB
24_S-0 1.4 MB
25_S-0.1 1.4 MB
26_S-1 175.4 KB
27_S-2 1.4 MB
28_S-3 1.4 MB
29_S-4 1.4 MB
30_S-4.1 1.4 MB
31_S-5 1.4 MB
32_S-5.1 1.4 MB
33_S-6 1.4 MB
34_S-7 1.4 MB
35_S-8 1.4 MB
36_MPFP1.1 414.9 KB
37_MPFP1.2 421.4 KB
38_MPFP1.3 398.1 KB
39_MPFP1.4 339.0 KB
40_MPFP3.1 412.9 KB
41_MPFP5.1 296.4 KB
42_MPFP6.1 407.2 KB
43_MPFP6.2 288.4 KB
44_E0.0 412.3 KB
45_E0.1 369.3 KB
46_E0.2 374.7 KB
47_E0.3 314.3 KB
48_ED1.0 512.1 KB
49_ED1.1 433.7 KB
50_ED1.2 429.4 KB
51_ED1.3 420.2 KB
52_E1.0 375.5 KB
53_E1.1 506.7 KB
54_E1.2 580.3 KB
55_E1.3 507.6 KB
56_E1.4 392.3 KB
57_E5.0 363.6 KB