Lockport THSD 205 - 2024 Ceiling Replacement at Lockport Township HS Central Campus
The project includes, but is not limited to, the following: the demolition and replacement of existing plaster ceiling assemblies with acoustic lay-in ceiling grid assemblies including select electrical, mechanical, plumbing, plaster repair, and structural repair work.
Plans
(click to expand/collapse)
Name | Size | ||
01_G0.1 | 329.3 KB | ||
02_G0.2 | 1.7 MB | ||
03_G0.3 | 760.0 KB | ||
04_A8.0 | 318.1 KB | ||
05_A8.1 | 427.7 KB | ||
06_A8.1A | 1.9 MB | ||
07_A8.1B | 563.9 KB | ||
08_A8.2 | 631.0 KB | ||
09_A8.2A | 2.2 MB | ||
10_A8.3 | 424.5 KB | ||
11_A8.3A | 1.1 MB | ||
12_A8.4 | 409.4 KB | ||
13_A8.5 | 329.6 KB | ||
14_S1.2SCR | 539.3 KB | ||
15_S1.3SCR | 512.3 KB | ||
16_S1.4SCR | 564.6 KB | ||
17_S1.5SCR | 522.8 KB | ||
18_S2.1SCR | 292.9 KB | ||
19_S1.3WR | 511.7 KB | ||
20_S1.4WR | 501.7 KB | ||
21_S1.5WR | 350.2 KB | ||
22_S2.1WR | 330.7 KB | ||
23_S2.2WR | 416.9 KB | ||
24_S-0 | 1.4 MB | ||
25_S-0.1 | 1.4 MB | ||
26_S-1 | 175.4 KB | ||
27_S-2 | 1.4 MB | ||
28_S-3 | 1.4 MB | ||
29_S-4 | 1.4 MB | ||
30_S-4.1 | 1.4 MB | ||
31_S-5 | 1.4 MB | ||
32_S-5.1 | 1.4 MB | ||
33_S-6 | 1.4 MB | ||
34_S-7 | 1.4 MB | ||
35_S-8 | 1.4 MB | ||
36_MPFP1.1 | 414.9 KB | ||
37_MPFP1.2 | 421.4 KB | ||
38_MPFP1.3 | 398.1 KB | ||
39_MPFP1.4 | 339.0 KB | ||
40_MPFP3.1 | 412.9 KB | ||
41_MPFP5.1 | 296.4 KB | ||
42_MPFP6.1 | 407.2 KB | ||
43_MPFP6.2 | 288.4 KB | ||
44_E0.0 | 412.3 KB | ||
45_E0.1 | 369.3 KB | ||
46_E0.2 | 374.7 KB | ||
47_E0.3 | 314.3 KB | ||
48_ED1.0 | 512.1 KB | ||
49_ED1.1 | 433.7 KB | ||
50_ED1.2 | 429.4 KB | ||
51_ED1.3 | 420.2 KB | ||
52_E1.0 | 375.5 KB | ||
53_E1.1 | 506.7 KB | ||
54_E1.2 | 580.3 KB | ||
55_E1.3 | 507.6 KB | ||
56_E1.4 | 392.3 KB | ||
57_E5.0 | 363.6 KB |