Lockport THSD 205 - 2024 Ceiling Replacement at Lockport Township HS Central Campus
The project includes, but is not limited to, the following: the demolition and replacement of existing plaster ceiling assemblies with acoustic lay-in ceiling grid assemblies including select electrical, mechanical, plumbing, plaster repair, and structural repair work.
Specifications
(click to expand/collapse)
Name | Size | ||
Project Manual | 22.0 MB |